NWA Real Estate
Things to Do

It's The Big Dill, Not "The Big Deal" — And It Hasn't Broken Ground

Author

Phillip Shepard

Date Published

Families walking across an arched bridge on the Razorback Greenway in Northwest Arkansas

It's The Big Dill, not "The Big Deal," and it hasn't broken ground. In my roundup video I described a $50 million pickleball facility coming to Springdale, spent a while trying to recall the name on camera, and landed on "The Big Deal." The actual name is The Big Dill Pickleball Club & Academy — a pun, which is why it wouldn't come to me. And almost everything about the project has changed since I filmed.

The pickleball facility: bigger, later, and not built yet

The December 2024 announcement I was referencing had these specs, which I didn't go through on camera: $50 million, 70,000 square feet, 23 indoor and 30 outdoor courts, a roughly 900-seat center court, plus a bar, pro shop, restaurant and retail. 12 acres east of Interstate 49 on Emma Avenue in Springdale — which does match the location I gave.

What's happened since: groundbreaking slipped from spring 2025 to no later than the first quarter of 2026, the project is now being built in phases, and the total scope has grown to a projected $100 million to $150 million with off-site multifamily housing added for academy participants. The opening projection moved to the second quarter of 2027. It also picked up a research and education partnership with the University of Arkansas's health, human performance and recreation department in October 2025.

As of this writing it has not broken ground. If you're planning around it, plan for 2027 and phased, not 2026 and finished. I was right about the founder, though: Reggie Brasfield is an Arkansas native, and my point about local capital rather than outside money holds.

The Design Excellence Program is much bigger than I said

I called it "the Excellence program" and guessed "there's like maybe like seven major projects they really focus all their energy and efforts on." The real name is the Northwest Arkansas Design Excellence Program, run by the Walton Family Foundation, and as of December 2024 it had backed 20 projects with $28 million in design support since launching in 2015.

I also mischaracterized what it does. It isn't a construction grant. It funds the design phase and connects applicants to a curated roster of more than a hundred vetted architecture, landscape and urban design firms. That distinction is the whole reason the projects look the way they do — the money buys good architects, not bricks.

Three name fixes on the projects I listed:

  • "Theater Square" is TheatreSquared, one word, in downtown Fayetteville. It's an independent professional theatre company, not a Walton Arts Center program. It got $3.5 million in design support plus a separate $9 million capital grant.
  • "George Luther park in downtown Springdale" is Luther George Park — I had the name backwards. 14 acres, a $642,638 design grant in 2017, designed by Spackman Mossop Michaels with Trahan Architects, reopened in 2024.
  • The Rogers project I fumbled as "the main Railway" is Railyard Park, five acres in downtown Rogers by Ross Barney Architects, with the Butterfield Stage pavilion. About $8 million total, mostly from a 2018 bond, and it won the 2023 AIA National Urban Design Award.

The Bentonville school grant is a master plan, not a renovation

Here's the one I'd most want corrected, because it changes what's actually coming.

I said the middle school "needs a lot of renovation" and that they "got granted into the Excellence program" to redo it. What the Walton Family Foundation actually awarded, in December 2024, is a grant to Bentonville Public Schools for a master plan covering a 15-acre downtown campus that holds both Old High Middle School and R.E. Baker Elementary. It's a planning study for two schools and the land around them, not funding to renovate one building.

The grant amount, the architect and the construction timeline haven't been disclosed. So if you're a parent trying to figure out when your kid's school gets rebuilt, the honest answer is that nobody has said yet.

My speculation did hold up on one point. I guessed "they want to keep the structure of the building." The stated intent of the master plan is to honor and preserve Old High Middle School, which is nearly a century old, as a landmark. Good instinct, right conclusion.

One caveat on the comparison I reached for. I pointed to an earlier Bentonville school as the architectural precedent — "that was an architectural dream" — without naming it clearly enough for me to be sure now which one I meant. So I'm not going to guess in print. What's worth knowing is that Bentonville has architecturally notable schools in both the public and private systems, and they aren't the same thing: a private school's design budget tells you nothing about what a public master plan will produce. We'll find out when the plan is published.

The Greenway: my facts were right, "phase two" wasn't a thing

I described the Razorback Regional Greenway as "40 mile, one pathway, paved pathway from South Fayetteville all the way up to Bella Vista." That's correct on all counts — 40 miles, dedicated in 2015, running from Kessler Mountain Regional Park in Fayetteville to north of Lake Bella Vista, connecting seven communities: Bella Vista, Bentonville, Rogers, Lowell, Springdale, Johnson and Fayetteville.

What I got wrong is the framing. There's no announced "phase two." There are two separate 2025 items I appear to have merged:

The regional planning commission received a Design Excellence planning grant for a long-term Razorback Regional Greenway Corridor Plan — trail-oriented development, housing along the corridor, sustainability. That's a study, not construction, and it's the closest thing to the "reach out farther, connect to more housing" expansion I described.

Separately, Bentonville's city council accepted a $3.5 million Walton Family Foundation grant in August 2025 to build two new bridges and reroute a section of the Greenway damaged by 2022 flooding, with construction running from October 2025 to October 2026. That's real, funded, dated construction — but it's repair and rerouting, not the lighting-and-expansion package I described.

Venture capital: the claim is stronger than I made it, and the Little Rock jab was wrong

I said Northwest Arkansas "just takes the cake" for venture capital in Arkansas. The data is more emphatic than my phrasing. In 2024, Arkansas raised about $260 million across 18 deals, and Northwest Arkansas captured 92% of it.

Then I said this: "Even though there's like, oh, Little Rock, no one cares. Nope, nobody cares, okay, let's just be real." I want to take that back.

Little Rock has The Venture Center, which runs the FIS FinTech Accelerator — a program whose alumni have collectively raised more than $2.5 billion. It also runs the ICBA ThinkTech Accelerator. The Little Rock Regional Chamber runs Conductor, and there's the Little Rock Technology Park. And the $10 million Venture Center Arkansas Fund, capitalized by the Arkansas Development Finance Authority through federal State Small Business Credit Initiative dollars, made its first four investments in March 2025 — three of them in central Arkansas, one in Northwest Arkansas.

So the state's newest venture fund sent three of its first four investments to central Arkansas — the part of the state I'd just written off. I don't know the dollar split, only the count. Northwest Arkansas is the bigger venture market by a wide margin, and that's the accurate claim. It doesn't require running down the rest of the state to make it.

The state-level push I gestured at is that fund, plus Onward FX, a founder-funder exchange the Northwest Arkansas Council expanded statewide with the Arkansas Economic Development Commission in 2025. Its explicit purpose is widening capital access beyond Northwest Arkansas — the opposite of what I said it was focused on.

The soccer claim checks out

I said in passing that "we're big into soccer," and that's now more true than when I filmed. Ozark United FC is fielding a men's team in the USL Championship and a women's team in the USL Super League, targeting the 2026 season, with a 5,000-plus-seat expandable stadium planned at Pinnacle Hills in Rogers. Its youth academy expanded to six age groups for 2025–26. So the unusual-sports thesis holds: pickleball, mountain biking, climbing, and now professional soccer, in a metro of this size.